FEASIBILITY STUDY AND CONCEPT DESIGN FOR THE CONSTRUCTION OF THE HIGH-SPEED ROAD S19 "RZESZÓW - BABICA"

CLIENT

Generalna Dyrekcja Dróg Krajowych i Autostrad (GDDKiA)

INDICATIVE VALUE OF OPERATION

6,200,000 (Design Value)

YEAR OF CONSTRUCTION

2019 (End Design)

The design refers to the S19 highway in the section between the city of Rzeszów and the center of Babica and represents approximately 10 km of the most important project relating to the construction of the express connection road from Kielanówki to Barwinka.

The route of the S19 on the Rzeszów Południe - Babica section starts at km 11+400 after the "Rzeszów Południe" intersection and passes through little agricultural areas. The route crosses the areas of Racławówka, Boguchwała and Mogielnica, subsequently bypassing the city of Lutoryż and underpassing a forest trought the construction of a long tunnel. Then, the route runs close to the town, crosses the provincial road n. 988 and the railway line n. LK106, until the "Babica" junction at Km 21+671.

 

Basic technical parameters

- technical class - S

- design speed - 100 km / h

- maximum speed - 110 km / h

- number of lanes - 2x2

- lane width - 3.5

 

Major works of art:

1 tunnel (about 2.2 km double way);

6 overpasses;

2 road viaducts;

1 railway viaduct;

1 road underpass;

1 control center;

1 complex road junction;

Various consolidation works.