Works

FEASIBILITY STUDY FOR THE REHABILITATION OF THE CRAIOVA - DROBETA TURNU SEVERIN - CARANSEBES RAILWAY LINE, PART OF THE EASTERN MEDITERRANEAN CORRIDOR

GO TO PROJECT

TECHNICAL AND DETAIL DESIGN OF THE MAJOR AND MINOR ARTWORKS ON THE BYDGOSZCZ - TRICITY RAILWAY LINE - SECTION C: KM 187 + 000 AT KM 203 + 512

GO TO PROJECT

REHABILITATION OF THE RAILWAY LINE FRONTIERA-CURTICI-SIMERIA, LOT 2: KM 614 - GURASADA: SECTION 2A (KM 614 - CAP Y BRAZAVA) AND SECTION 2B (CAP Y BRAZAVA - CAP Y ILTEU)

GO TO PROJECT

METRO BUCHAREST, LINE 4 – “PARC BAZILESCU – STRAULESTI”

GO TO PROJECT

METRO BUCHAREST, LINE 5 – LOT DRUMUL TABEREI – PANTELIMON – UNIVERSITATE

GO TO PROJECT

REHABILITATION BUCHAREST – COSTANTA RAILWAY: SECTION 2, FUNDULEA – LEHLIU LOT 1 – BRIDGE AT SECTION

GO TO PROJECT
12